Golfbad-Sauna Chemnitz Rehabilitation and Extension Health park Golfbad-Sauna in Chemnitz / Oberrabenstein
Short description of the supporting structure of the existing building
General:
one-storey construction partly with basement as extension of the available building
Foundation:
ground panel made of reinforced concrete as a water proof construction
Truss:
fixed reinforced concrete column in the facade and masonry walls for the bedding of the ceiling downstand beams
Slabs:
Basement slab as a filigree floor layed on the basement walls roof ceiling as a filigree floor layed on beams and masonry walls
Stabilization:
The Stabilization of the building is made by masonry walls and the fixed reinforced concrete columns. Because of the expected thermal expansion, the roof ceiling will be layed relocatable on the circulate peripheral tie beam. The bracing of the masonry will be made over braced crosswalls and the circulate peripheral tie beam.
Miscellaneous:
outdoor basin 9.80x10.98m. The water depth is 1.35m.
CERTIFICATES
The C&E Consulting and Engineering GmbH Chemnitz is certified according to DIN EN ISO 9001:2015.
DETAILS
Services:
Object planning, Structural Engineering, Building Services, physical evidence
Service phase 1 to 8 after HOAI §15, §64, §73, §77, §81
Client:
Eissport- und Freizeit GmbH Chemnitz
Costs:
850 T€