C&E-Referencelist Special and Auxilliary Buildings/ Construction Engineering (PDF, partly in German)
- New Construction of the Chemnitz Football Club stadium located at Gellertstraße
- New Design of a Landfill / Long-term Interim Storage Facility at the Abandoned Quarry Freiheit III
- Nature-orientated Water body Improvement „Mühlgraben Merseburg“
- S 258 Resurfacing of the By-pass Road Elterlein
- Photovoltaic installation in the disposal and city cleaning company Chemnitz (ESC)
- Photovoltaic plant for the evangelistic church Zwickau-Bockwa
- Historic “Pumpwerk Chemnitz“
Partial Project “Trinkwasser-Verteilerkreuz"
Reconstruction and Restoration of Historic “Pumpwerk Chemnitz“ - Mechanical-biological-waste-recycling-plant, Cröbern
Construction of a new plant on a uncompacted inside dump area of a former open pit, central landfill Cröbern - Mechanical-biological treatment plant, Oelsnitz / Vogtland
Development of whole building complex - Navigable waterway connection between lakes Spreetal NO – Sabrodter See / Connecting Channel 1
Planning overall system - Navigable waterway connection between lakes Blunoer Südsee – Partwitzer See / Connecting Channel 7
Planning overall system - Navigable waterway connection between lakes Geierswalder See – Senftenberger See / Connecting Channel 12
Planning overall system - Water treatment plant Königstein
New development overall system - Elevated tank Reichenhain, Chemnitz
Replacement new building and remediation of the historical saving body - 5 Courtyards in Munich
Inner city project
Securing a building Gablerhaus; a reinforced frame construction was been shortened from approx. 40,0 m length to 35,0 m, temporary supported and sterically stabilized - 5 Courtyards in Munich
Inner city project
Lifting and temporary securing of a-with paintings decorated- steel dome (ca. 30x8 m) of 1950 - Securing of buildings
Exemption of veneers, compete core demolition of buildings, securing of gables, vaults, cross vaults etc. in the area of Berlin, Bamberg, Chemnitz, Dortmund, Leipzig, Munich, Speyer, Zwickau, etc.. - Paper mill Weißenborn
Special-underpinnings for extensions at which the existing foundation have to be absolutely free of settlement - Network calculation Public Utility Company Chemnitz, Ortsnetz Chemnitz-Glösa
- Output bore holes for venting of monitoring roadways Wismut GmbH, SB Königstein
- Enstallation of gauging stations at streams Wismut GmbH, SB Ronneburg
- Street lighting Chemnitz, Oberfrohnaer Straße
- Transformer station SL4 Hospital Chemnitz
- Transformer station MBS Vogtland
- Hydrological monitoring program fin channel
Hydrological monitoring of securing evidence - Hydrological monitoring program Saale-Elster-Aue
Hydrological monitoring of securing evidence - Mechanical-biological plant Vogtland
Subsoil expertise, technical assistance, geotechnical site monitoring Client: NEHLSEN Dresden GmbH & Co. KG
Client: NEHLSEN Dresden GmbH & Co. KG - Mechanical-biological plant Cröbern
Geotechnical field and laboratory investigations on the further locations, development of a foundation type and improvement of soil using gravel compaction column (Geopier ®), numerical evaluation of subsidence, geotechnical site monitoring, development of a concept for access road
Client: HOCHTIEF Construction AG, Leipzig