Town Hall Zwickau Redesign and Reconstruction including a extension building
BUILDING SERVICE - Electric
The Project contained the redesign of an historic building and the new construction of an extension with a hall and offices. Therefore the complete electric facilities were planned as following:
- Lighting: Mainly energy saving lamps were installed. The management of illumination was created in cooperation with the client, to ensure optimal workplace lighting with maximum energy efficiency. In the listed areas appropriate lighting was installed.
- Some architectural effects are realized with usage of highly efficient LED-Technology. Especially the background lighting of the leaded windowor parts of the exteriour lighting.
- Installation of an elevator between old and new building to achieve barrier free access to all parts of the building
- Establishment of a modern and future-oriented data network
- Fire protection system with different reporting systems
- Burglar alarm in all parts of the building
- The hall was equipped with a modern media technology for different usages. Main focus was good voice reproduction (i.e. for meetings of the city council)
- Central battery to provide safety lighting
- Emergency power generator to ensure fire protection and operation and climatisation of the data systems.
CERTIFICATES
The C&E Consulting and Engineering GmbH Chemnitz is certified according to DIN EN ISO 9001:2015.
DETAILS
Services:
Structural Engineering
Service Phase 2 to 6 with § 64 HOAI
Building Service
Service Phase 1 to 8 with § 73 HOAI
Proofs for Structural Analysis
Service Phase 1 to 5 with §§ 78, 81 HOAI
Client:
Stadt Zwickau, Hochbauamt
GGZ Gebäude- und Grundstücksgesellschaft Zwickau mbH
Costs:
(total) 17,000,000 €