Services Themes

Reconstruction of Municipal youth hostel Chemnitz

STRUCTURAL ENGINEERING

The existing building has been preserved in its qualities and supplemented with new, modern and reduced elements. The main element of reconstruction was the new accession sculpture indicating the way from the foyer into the vertical direction. In this way the future accommodation rooms of the youth hostel can be reached. The effortless steel sculpture is twisted around two massive concrete cores containing a lift and an external lifting platform for a barrier-free entrance to the building. To reach the third upper level the staircase breaks through the roof panel and finds its upper limit in a simple aluminium-glass-construction being suspended from a cantilevered massive ceiling.


CERTIFICATES

The C&E Consulting and Engineering GmbH Chemnitz is certified according to DIN EN ISO 9001:2015.

Other certifications and approvals

DETAILS

Services:
Object planning of building
HOAI stages 1-9 German Fee Structure for Architects and Engineers

Structural Engineering
HOAI stages 1-9 German Fee Structure for Architects and Engineers

Building services
HOAI stages 1-9 German Fee Structure for Architects and Engineers

Services for thermic building physics / heat insulation
Fire protection concept
Security and health protection coordinator

Client:
eins energie in sachsen GmbH & Co. KG
AugustusburgerStrasse 1
09111 Chemnitz

Total construction costs:
10.700 TEUR