Complete reconstruction of existing buildings as well as extensions for vocational schools of Weißenfels
STRUCTUAL ENGINEERING
Extension (building 1A):
- Construction of a school building of solid construction, 4-storey, overall length 107 m
- Disconnection in two building sections via expansion joint in partial areas of 51 m and 56 m
- ceilings (partly cantilevered) made of prefabricated floor slabs supported on walls and downstand beams
- bearing walls in masonry, partly reinforced concrete columns and reinforced concrete downstand beams as floor bearing
- stair flights and main landings as prefabricated construction, halfpaces made of in-site concrete with noise control-technical separation
- strip foundations under walls, isolated foundation under thereinforced concrete columns
- construction of the floors as membranes with uninterrupted peripheral tie beam for degradation of the wind loads into the cross walls and longitudinal walls
Renovated old building (building 1B):
- building complex, composed of a three-storey front building, three-storey central block as well as a one-story addition
- new gable roof as purlin roof with bitumen covering and ribbon windows in the corridor area just in the central block
- new bearing walls in masonry, foundation on strip foundations
- dismantling of the existing engine-room of the elevator, construction of a passage
- heightening of the one-storey addition on two floors with masonry walls and saddleroof girder
- peripheral tie beam construction for horizontal strutting of the wall construction
Villa (building 2):
- no static intervention into the building substance
Boiler house (building 3):
- conversion of a part of the boiler house into a construction hall
- renewal of the roof covering and the wall covering
CERTIFICATES
The C&E Consulting and Engineering GmbH Chemnitz is certified according to DIN EN ISO 9001:2015.
DETAILS
Services:
Overall planning with educational work shops and labour areas,supervision of construction
Client:
District office Weißenfels, building authority and environmental agency
Costs:
13.500 T€