Town center development Chemnitz - Building site 3 New building Office- and commercial building
TECHNICAL BUILDING EQUIPMENT HLS
Ventilation and air conditioning
- Underground car parking ventilation- and smoke elimination with CO-alarm system (around 35000m³/h)
- Ventilation- and aeration system dressing rooms in the basement
- Air conditioning- and smoke elimination system foyer municipality (around 10.000m³/h)
- Ventilation- and aearation system archive- and technology area as well as advisory rooms municipality
- redundant air conditioning of the server room of the municipality, cooling capacity 120 kW
- Aeration systems for all sanitary areas on the office storeys
- Ventilation systems central market with functional areas for meat processing, baker as well as fruits and vegetables
- Ventilations- and aeration system with dehumidification function for physiotherapy with motion basin
- Ventilation systems for approx. 20 different retail shops with heat recovery in connection with air circulation equipment for the heating- and cooling system
- Aeration systems for approx. two restaurant areas including kitchen ventilation
Heating
- Construction of a flexible media distribution district heating and district cooling for approx. 30 different users
- Temperature control of the office rooms of the levels 2 to 4 with concrete core activation (heating- and refrigerated service, around 3000 square meter)
- Heating of the office areas with local heating areas
- Door heaters for all store units
Extinguishing equipment
- Sprinkler system for the underground car park, the user ground floor and first
- floor as well as the foyer municipality on the 4th floor
- Construction gas extinguish system for the Server room of the municipality
- Construction drying standpipe mounting pillar for 4 stairwells
- Equipment of the entire building with extinguishers
Sanitary
- Lifting installations and extractor for the wastewater disposal
- Construction of a flexible drinking water distribution for approx. 30 different users
- Sanitary equipment of all users, including:
- Central market with intakes and sanitary objects for the meat processing as well as the baker
- physiotherapy with exercise pool (around 30 square meter)
- 2 restaurants with kitchen area
CERTIFICATES
The C&E Consulting and Engineering GmbH Chemnitz is certified according to DIN EN ISO 9001:2015.
DETAILS
Services:
General planning and supervision of construction
Client:
City Chemnitz building
sites 3 and 6 GbR
Am Rathaus 8
09111 Chemnitz
Costs:
29.058 T€