Services Themes

Town center development Chemnitz - Building site 3 New building Office- and commercial building

TECHNICAL BUILDING EQUIPMENT HLS

Ventilation and air conditioning

  • Underground car parking ventilation- and smoke elimination with CO-alarm system (around 35000m³/h)
  • Ventilation- and aeration system dressing rooms in the basement
  • Air conditioning- and smoke elimination system foyer municipality (around 10.000m³/h)
  • Ventilation- and aearation system archive- and technology area as well as advisory rooms municipality
  • redundant air conditioning of the server room of the municipality, cooling capacity 120 kW
  • Aeration systems for all sanitary areas on the office storeys
  • Ventilation systems central market with functional areas for meat processing, baker as well as fruits and vegetables
  • Ventilations- and aeration system with dehumidification function for physiotherapy with motion basin
  • Ventilation systems for approx. 20 different retail shops with heat recovery in connection with air circulation equipment for the heating- and cooling system
  • Aeration systems for approx. two restaurant areas including kitchen ventilation

Heating

  • Construction of a flexible media distribution district heating and district cooling for approx. 30 different users
  • Temperature control of the office rooms of the levels 2 to 4 with concrete core activation (heating- and refrigerated service, around 3000 square meter)
  • Heating of the office areas with local heating areas
  • Door heaters for all store units

Extinguishing equipment

  • Sprinkler system for the underground car park, the user ground floor and first 
  • floor as well as the foyer municipality on the 4th floor
  • Construction gas extinguish system for the Server room of the municipality
  • Construction drying standpipe mounting pillar for 4 stairwells
  • Equipment of the entire building with extinguishers

Sanitary

  • Lifting installations and extractor for the wastewater disposal
  • Construction of a flexible drinking water distribution for approx. 30 different users
  • Sanitary equipment of all users, including:

- Central market with intakes and sanitary objects for the meat processing as well as the baker
- physiotherapy with exercise pool (around 30 square meter)
- 2 restaurants with kitchen area

CERTIFICATES

The C&E Consulting and Engineering GmbH Chemnitz is certified according to DIN EN ISO 9001:2015.

Other certifications and approvals

DETAILS

Services:
General planning and supervision of construction

Client:
City Chemnitz building
sites 3 and 6 GbR
Am Rathaus 8
09111 Chemnitz

Costs: 
29.058 T€