Town center development Chemnitz - Building site 3 New building Office- and commercial building
TECHNICAL BUILDING EQUIPMENT ELT
Planning of the entire elctrical engineering installations to the following extent:
- Office- and business building with energy efficient lighting systems and data- communication connectios for the employees of the municipality and other tenants.
- Electrical installations for the retail trade shops, markets, restaurants and cultural institutions.
- Underground car park with emergency power supply, central battery facility and energy systems for the entire building in the basement.
- The energetic and information technical devolpment of the building is made over 4 main lifting platforms over 5 storeys.
- Data connection for the municipality with fibre optic cables from the town hall.
- Security systems and data systems will be provided with emergency power supply, battery system and USV in case of a power outtage.
- TV-, FM-installations for all tenants.
- Fire-detection system, as well as smoke- and heating exhaust systems in connection with an distress call information system.
- Escape door control system and door intercom system.
- BOS-radio installation for the fire brigade Chemnitz for the building complex in case of an emergency.
- Complete lightning protection system including earthing and equipotential bonding.
CERTIFICATES
The C&E Consulting and Engineering GmbH Chemnitz is certified according to DIN EN ISO 9001:2015.
DETAILS
Services:
General planning and supervision of construction
Client:
City Chemnitz building
sites 3 and 6 GbR
Am Rathaus 8
09111 Chemnitz
Costs:
29.058 T€