Services Themes

Town center development Chemnitz - Building site 3 New building Office- and commercial building

TECHNICAL BUILDING EQUIPMENT ELT

Planning of the entire elctrical engineering installations to the following extent:

  • Office- and business building with energy efficient lighting systems and data- communication connectios for the employees of the municipality and other tenants.
  • Electrical installations for the retail trade shops, markets, restaurants and cultural institutions.
  • Underground car park with emergency power supply, central battery facility and energy systems for the entire building in the basement.
  • The energetic and information technical devolpment of the building is made over 4 main lifting platforms over 5 storeys.
  • Data connection for the municipality with fibre optic cables from the town hall.
  • Security systems and data systems will be provided with emergency power supply, battery system and USV in case of a power outtage.
  • TV-, FM-installations for all tenants.
  • Fire-detection system, as well as smoke- and heating exhaust systems in connection with an distress call information system.
  • Escape door control system and door intercom system.
  • BOS-radio installation for the fire brigade Chemnitz for the building complex in case of an emergency.
  • Complete lightning protection system including earthing and equipotential bonding.

CERTIFICATES

The C&E Consulting and Engineering GmbH Chemnitz is certified according to DIN EN ISO 9001:2015.

Other certifications and approvals

DETAILS

Services:
General planning and supervision of construction

Client:
City Chemnitz building
sites 3 and 6 GbR
Am Rathaus 8
09111 Chemnitz

Costs: 
29.058 T€