Services Themes

Reconstruction and renovation "Alte Försterei" (old forestry) including extension to a day-care center in Grüna

Structural Engineering

Overall complex, consisting of a listed, three-storey masonry building and two bordering two-storey new buildings, design as a three-sided yard according to historical ideal

Old building:

  • static verifications of the listed existing building structure for a increased traffic load because of utilization as a day-care center
  • gutting of all timber beam floors including following partial renewal of fungal attacked building elements and reinforcement of the beams due to load increase
  • finishing and completion of the attic floor by the omission of existing partition wall and stabilization by installation of a new knee brace plate
  • installation of a new staircase as a second escape route and strengthening of the existing staircase made of the porphyry rock
  • Construction of extensive bearing constructions and transfer structure because of minimal bearing capacity of the existing natural stone masonry of irregular porphyry rocks


New building:

  • The building received a slab foundation with a frost barrier because of irregular foundation circumstances and the barely controllable settlement differences
  • Stabilization by reinforced concrete floor, peripheral tie beam and masonry panels
  • Utilization of a cross pile slab as roof panel icrease the indoor climate
  • Linking of the separate building structures by a connecting structure with lintel-pillar-construction

CERTIFICATES

The C&E Consulting and Engineering GmbH Chemnitz is certified according to DIN EN ISO 9001:2015.

Other certifications and approvals

DETAILS

Service:
structural engineering, physical
proof, reinforcement acceptance test
as well as sanitary engineering and electrical engineering
and Supervision of construction, work stage. 1-6 und 8
according to HOAI §§ 64,73,77,81

Client:
AWO KV Chemnitz und Umgebung e.V.

Costs:
2.500 T€