New building of a production hall with office area, company Glumann Mechanical Engineering AG Chemnitz
GENERAL PLANNING
New building of a production hall with office area
- difficult building ground and groundwater conditions (Construction ground drainage / with it feeding biotop)
- Renaturation of several Groundwater control points at the foot of the former airport dump
- Construction of a modern Extension (hall, social building and foreman office) which is construed to the needs of the technologies of the mechanical engineers (deep hole bore of semi-finished parts of the Tool- and Mechanical engineering) on the area of Glumann Mechanical Engineering AG, which should be construed of the perspective planned expansion of the hall
- Highest flexibility inside the building (clear-span), to afford rebuilding in the current production process (including deep foundation with bored piles); crane way with 2 bridge crane plants (1x 20t, 1x 8t)
- Design of the facade: Utilization of modern building elements (Time-/Cost factor) below comprehension of the Corporate Identity of the client
- Heating: Establishing a connection to the existing long-distance heat connection of the inventory building
- Ventilation system with heat recovery
- Illumination according to workplaces policy and in consideration of the crane way plant
- Outdoor installation: partly sealed fire lane as well as for heavy - vehicle traffic construed hall forecourt; partly slope protection in the direction of the Airport dump
CERTIFICATES
The C&E Consulting and Engineering GmbH Chemnitz is certified according to DIN EN ISO 9001:2015.
DETAILS
Services:
General planning and Supervision of Construction
Service Phase 1 to 8
Client:
Fa. Glumann Maschinenbau AG
Costs:
1.100 T€