New building production hall with Office wing company Karl UTZ, Kändler
STRUCTUAL ENGINEERING
- Production hall with wide tension two pin joint - steel framework
- Crane runway for overhead crane on steel beams
- Area by area inserted ceilings integrated
- Bracing through bond compartmentations
- Foundation over single foundation and strip foundation in frost-free depth
- Prefabricated - frost barrier
- Administration building reinforced concrete-skeleton- construction
- Grouted anchor of the ceilings based on economical required spans
- Glazing over three floors as pile-wale-construction on the corner regions administration building
- Fire wall to the hall in masonry
- Inside elevator in reinforced concrete shaft
CERTIFICATES
The C&E Consulting and Engineering GmbH Chemnitz is certified according to DIN EN ISO 9001:2015.
DETAILS
Service:
Building permission application
Client:
Wiemer & Trachte AG
Costs:
2.400 T€