Hospital Chemnitz - Gynaecological Hospital Reconstitution of the wards 12, F110, F220, F320 and of the day hospital

TECHNICAL BUILDING EQUIPMENT

Complete rehabilitation of several wards in existing buildings in different construction phases. Equipment for the wards like general distribution board and safety distribution board, lighting, communications system, fire-detecting system and nurse calling system as well as TV installation and electronic data processing system.

Electrical Engineering

Planning of electrical installations considering the existing building fabric in the following complexity:

Hospital Chemnitz - Gynaecological Hospital, ward 12

  • low voltage swithgears consisting of 1 main distribution board of the building, 1 safety distribution board main distribution board, 2 general distribution boards-storey distribution boards and 2 safety distribution boards-storey distribution boards including complete building feed by the transformer station.
  • low voltage installations of the general distribution board and the safety distribution board including 38 km cables and conductions, including 2,2 km cable laying system as well as all of the installation in conventional technology
  • 35 medical supply units for all of the hospital patient rooms including integrated 145 illumination components for indirect lighting of the room, reading lamps and night lighting
  • a lighting system made for the hospital includes 335 single luminaires and 45 safety luminaires
  • complete lightning protection system including lightning conductor, earthing and equipotential bonding
  • calling system for the hospital patients including two group receptions, 294 different modules, and alteration electronics and disposer
  • fire-detecting system including fire alarm center, zone locator, couplers and 278 automatic fire detectors and 15 hand-operated fire detectors, as well as electroacoustic system
  • TV-installations including two house connection amplifiers, 35 TV-connection points including cabling to the respective termination box
  • frequency modulation installation including a main distributor, two storey distributors, and 35 frequency modulation installations including cabling to the respective termination box
  • EDP-network with contributor cabinet and 34 data circuit points as well as network and structured cabling to the termination box
  • 4 smoke and heat funnel plants complete
  • 2 complete escape door control as well as 2 door speak installations including wiring

Clinic Chemnitz, gynaecological- and baby clinic, Stations F110, F220 and F320 each with

  • low-voltage switchgear composed of 1 AV contributor, 1 SV contributor with complete input of the building main contributor AV and SV and whose Extension
  • low-voltage Installation plant of the general electric power supply (AV) and the safety electric power supply (SV) with 24km cable and wires, with 1,7km cable laying system as well as all installation equipment in conventional Technology
  • 23 medical supply unity for all patient rooms with the appropriate 112 lumination elements for the indirect room illumination, reading luminaires and night luminaires
  • The hospital adapted illumination plant with 250 single luminaires and 14 safety luminaires
  • Patients public address system with 2 group receptions, 126 different modules wall electrics and disposer
  • BMA-installation with central fire alarm system, coupler and 116 automatic and 5 hand-alarms, as well as extension of the ELA-installation of the gynaecological clinic
  • TV-installation with a house connection amplifier, 15 TV-circuit points inclulding cabling to the termination box
  • FM-installation with a level contributor and 26 FM-circuit points including cabling to the termination box
  • EDP-network with contributor cabinet and 38 data circuit points as well as networking and structural cabling to the tremination box
  • 2 complete escape door controls and 2 door speaker systems including wiring

Clinic Chemnitz, gynaecological- and baby clinic, Day hospital

  • low-voltage switchgear composed of 1 AV contributor, 1 SV contributor with complete input of the building main contributor AV and SV
  • low-voltage Installation plant of the general electric power supply (AV) and the safety electric power supply (SV) with 27km cable and wires, with 1,9km cable laying system as well as all installation equipment in conventional Technology
  • 23 medical supply unity for all patient rooms with related 52 wall fitting-, floor fitting- and wall extension luminaires
  • The hospital adapted illumination plant with 225 single luminaires and 13 safetyluminaires
  • Complete lightning protection system with lightning conductor, earthing and potential equalizing
  • Patients public address system with 2 group receptions, 153 different modules wall electrics and disposer
  • BMA-installation with central fire alarm system, coupler and 120 automatic and 5 hand-alarms, as well as extension of the ELA-installation of the gynaecological clinic
  • TV-installation with a house connection amplifier, 15 TV-circuit points inclulding cabling to the termination box
  • FM-installation with a level contributor and 26 FM-circuit points including cabling to the termination box
  • EDP-network with contributor cabinet and 38 data circuit points as well as networking and structural cabling to the tremination box
  • One smoke and heat funnel plants complete
  • 2 complete escape door controls and 2 door speaker systems including wiring including wiring

CERTIFICATES

The C&E Consulting and Engineering GmbH Chemnitz is certified according to DIN EN ISO 9001:2015.

Other certifications and approvals

DETAILS

Services:
work stages 1-9 of the elektrical
engineering as well as
the communication technology

Client:
Klinikum Chemnitz gGmbH

Costs:
565 T€