Services Themes

Clinical Center Chemnitz - Hospital Dresdner Straße Reconstruction Building A, Building B, Intensive-care unit

TECHNICAL BUILDING EQUIPMENT


Complete redevelopment of several old buildings in construction phases.
Integration of the electrical and communication installations on the latest standard
into the existing construction architecture.

Electrical engineering

Planning of the eletrical installations under consideration of the existing building
stock to the following extent:

Clinical Center Chemnitz, Hospital Dresdner Str., Building A

  • Low-voltage switch gear made of 1 AV building main distributor, 1 SV building main distributor, 4 AV-floor distributors and 4 SV-floor distributors with complete building supply from the transformer station
  • Low-voltage installation system of the general electricity supply (AV) and the safety electricity supply (SV) with 55km cable and wires, with 3,5 km cable installation systems as well as all installation equipments in conventional technology
  • 55 medical supply units for all patient rooms with corresponding 145 wall fitting-, ceiling fitting- and wall extension luminaries
  • to the hospital adapted illumination system with 635 separate luminaries and 45 safety luminaries
  • complete lightning protection system with lightning conductor, earthing and equipotential bonding
  • patients distress call systems with group central office, 328 different modules, wall electronics and transmitters
  • BMA-installation with central fire alarm system, zone locator, couplers and 265 automatic and 15 hand-detection devices
  • TV-installation with 4 house connection amplifiers, 35 TV-connections including cabling to the respective termination box
  • Fm-installation with one main distributor, 4 floor distributors and 35 Fm connections including cabling to the respective termination box
  • Electronic data processing-network with distributing cabinet and 30 data connections as well as networking and structured cabling to the respective termination box
  • 4 smoke- and heat exhaust system complete
  • 8 complete escape door control system and 6 entry phone installations including wiring

Clinical Center Chemnitz, Hospital Dresdner Str., Building B

  • low-voltage switch gear made of 1 AV building main distributor, 1 SV main distributor, 4 AV-floor distributors and 4 SV-floor distributors with complete building supply from the transformer station
  • Low-voltage switch gear installation system of the general electricity supply (AV) and the safety electricity supply (SV) with 55 km cable and wires, with 3,5 km cabling system as well as all installation equipments in conventional technology
  • 55 medical supply units for all patients rooms with corresponding 145 wall fitting-, ceiling fitting- and wall extension luminaries
  • to the hospital adapted illumination systems with 635 separate luminaries and 45 safety luminaries
  • complete lightning protection system with conductor, earthing and equipotential bonding
  • patients distress call system with group central office, 328 different modules, wall electronics and transmitters
  • BMA-installation with central fire alarm system, zone locator, couplers and 265 automatic and 15 hand-detection devices
  • TV-installation with 4 house connection amplifiers, 35 TV connections including cabling to the respective termination box
  • Fm-installation with one main distributor, 4 floor distributors and 35 Fm connections including cabling to the respective termination box
  • Electronic data processing-network with distributing cabinet and 30 data connections as well as networking and structured cabling to the respective termination box
  • 4 smoke- and heat exhaust system complete
  • 8 complete escape door control system and 6 entry phone installations including wiring

Clinical Center Chemnitz, Hospital Dresdner Str., Intensive-care unit

  • Low-voltage switch gear made of 2 AV main distributors, 2 SV main distributors, 10 AV-floor distributors and 10 SV-floor distributors with complete building supply from a transformer station
  • Low-voltage switch gear installation system of the general electricity supply (AV) and safety electricity supply (SV) with 65 km cables and wires, with 5,0 km cabling system as well as all installation equipments in conventional technology
  • 60 medical supply units, out of it 12 supply units of the intensive-care medicine for all patients rooms with corresponding 165 wall fittings-, ceiling fittings- and wall extension luminaries to the hospital adapted illumination system with 635 separate luminaries and 55 safety luminaries
  • complete lightning protection system with conductor, earthing and equipotential bonding
  • patients distress call system with group central office, 286 different modules, wall electronics and transmitters
  • BMA-installation with central fire alarm system, zone locator, couplers and 285 automatic and 18 hand-detection devices
  • TV-installation with 4 house connection amplifier, 35 TV connections including cabling to the respective termination box
  • Fm-installation with one main distributor, 4 floor distributors and 35 Fm connections including cabling to the respective termination box
  • Electronic data processing-network with distributing cabinet and 30 data connections as well as networking and structured cabling to the respective termination box
  • 4 smoke- and heat exhaust system complete
  • 8 complete escape door control system and 6 entry phone installations including wiring

CERTIFICATES

The C&E Consulting and Engineering GmbH Chemnitz is certified according to DIN EN ISO 9001:2015.

Other certifications and approvals

DETAILS

Sevices:
Service phases 1 to 9 of electrical engineering as well as the communication- and information egineering

Client:
Clinical Center Chemnitz gGmbH

Costs:
1.685 T€