New Construction "Bürgerhaus Am Wall" Component Administration Building
BUILDING SERVICE - sanitary technology
The office area is heated and cooled through thermal activation of building structures. For local heating requirements also heating surfaces were installed in coordination with the building concept.
In rooms with special requirements, like consultation rooms or the archive sector, an air condition was planned.
To meet the demands of the user in the entranche area, besides of heating and air conditioning, special standarts for fire protection had to be fulfilled. A sprinkler system and a smoke extraction were installed.
Another focus in the building service is the server room of the city administration. To guarantee the necessary atmosphere a redundant air conditioning with 120kW was installed. The wide control range and the airflow through double floor guarantee efficient operation. To protect the technology in case of fire, a gas extinguishing system was installed.
CERTIFICATES
The C&E Consulting and Engineering GmbH Chemnitz is certified according to DIN EN ISO 9001:2015.
DETAILS
Services:
Object Planning
Service Phase 1-9 with § 15 HOAI,
Structural Engineering
Service Phase 1-6 with § 64 HOAI,
Building Service
Service Phase 1-9 with § 73 HOAI,
Thermal Building Physics
Rebar Inspections
Client:
City Chemnitz Baufelder 3 und 6 GbR
Am Rathaus 8
09111 Chemnitz
Costs:
29,058,000 €
FURTHER SERVICES
General Planning:
- Architecture/Object Planning
- Structural Engineering
- Building Service (electric)
- Thermal Building Physics