New Construction "Bürgerhaus Am Wall" Component Gastronomy
BUILDING SERVICE - Mechanical, Electrical, Plumbing
The equipment of the gastronomy area was planned with usage of the central supply system of the building. In addition the design of he guest rooms, especially the layout of the suspended ceilings and the installation of the building service parts and the lighting in the ceilings acted a central part.
The heating of the guest room in "Cafe Michaelis" is implemented with floor heating. Also a external air curtain system was installed in the suspendet ceiilng. Furthermore the complete area is ventilated with an area by area switchable air conditioning. To compensate the open construction (fire protection requirement) a sprinkler system was installed. The building technology is designed for all requirements of the utilisation in a kitchen, like separate drainage (including a fat separator), central water treatment as well as a special ventilation. Sanitary facilities (including a lavatory for handicapped) were also included in the water treatment.
A second gastronomical area is used for a Sushi Bar. An open kitchen inside the guest room provides another special task for ventilation and exhaust air. Also heating takes place with the ventilation system. The kitchen got a separated drainage including fat separator. Sanitary facilities were designed corresponding to the ideas of the client.
CERTIFICATES
The C&E Consulting and Engineering GmbH Chemnitz is certified according to DIN EN ISO 9001:2015.
DETAILS
Services:
Object Planning
Service Phase 1-9 with § 15 HOAI,
Structural Engineering
Service Phase 1-6 with § 64 HOAI,
Building Service
Service Phase 1-9 with § 73 HOAI,
Thermal Building Physics
Rebar inspections
Client:
City Chemnitz Baufelder 3 und 6 GbR
Am Rathaus 8
09111 Chemnitz
Costs:
29,058,000 €
Further Services
General Planning:
- Architecture/Objekt Planning
- Structural Engineering
- Building Service (electric)
- Thermal Building Physics