C&E-проекты Планироваине горных работ
- Aue, Saxony - Shaft closure.pdf (154.0 КиБ)
- Closure of shafts 398 Koenigstein.pdf (73.7 КиБ)
- Closure of ventilation borehole Koenigstein.pdf (96.9 КиБ)
- Disaster Response System and Monitoring Mine Spill.pdf (427.5 КиБ)
- Ronneburg, Mine damage.pdf (250.7 КиБ)
- Ronneburg, Shaft closure.pdf (139.5 КиБ)
- Koenigstein, Shaft closure.pdf (96.2 КиБ)
- Mine borehole Koenigstein (German).pdf (135.3 КиБ)
- Mine Capacity Extension Study, Ukraine.pdf (88.4 КиБ)
- Mining Lermontov, Russia - Remediation concepts.pdf (89.5 КиБ)
- Mining sites South-Bulgaria.pdf (76.4 КиБ)
- Niederlausitz, Brandenburg - Mine subsidence Trebendorf.pdf (111.3 КиБ)
- Plugging of 36 shafts.pdf (56.3 КиБ)
- Remediation of the gallery system Jena, Detail design.pdf (72.3 КиБ)
- Remediation of the gallery system Jena, Supervision construction works.pdf (114.7 КиБ)
- Remediation of the pit Reiche Zeche, Freiberg (German).pdf (322.9 КиБ)
- Koenigstein, Conveying holes.pdf (147.7 КиБ)
- Koenigstein, Bulkheads underground.pdf (197.7 КиБ)
- Schneeberg, Saxony.pdf (155.0 КиБ)
- Shaft securing Koenigstein (German).pdf (89.9 КиБ)
- Zwickau and Oelsnitz - Mining area.pdf (95.6 КиБ)
СЕРТИФИКАТЫ
С&Е Консалтинг и Инжиниринг ГмбХ Хемниц сертифицирована в соответствии с DIN EN ISO 9001:2015.